Skip to content
Stellar TechConnections

Design and advise

Clarity before code.

Research with the people who use the system, then workflow and interface design that is tested before anything is built.

At a glance

Best for
Teams about to build or replace a system, and unsure what people actually need
Typical engagement
[XYZ: confirm]
Typical duration
[XYZ: confirm]
Team
[XYZ: confirm]
Talk to an engineer

The problem

Where this costs you time.

  • Built for the org chart, not the user

    Screens that mirror how the project was managed, not how work is done.

  • Discovering problems in production

    Usability issues found after launch, when they are expensive to fix.

  • No shared picture

    Stakeholders imagine different products until the first demo.

What we do

Capabilities

[XYZ: confirm scope with engineering]
  • Research with operators

    Interviews and observation with the people who do the work.

  • Workflow design

    The process mapped and simplified before screens are drawn.

  • Interface and design systems

    Consistent, accessible interfaces built from a shared system.

  • Prototypes

    Clickable prototypes to test before build.

  • Usability testing

    Testing with real users and fixing what we find.

  • Handover to engineering

    Specifications and components that developers can build from.

Benefits

What changes when this works.

Outcomes we design for. Measured results appear only after a client confirms them.

  • Decisions made on evidence from real users
  • Problems found in a prototype, not in production
  • One shared picture of what is being built
  • A design system that keeps future work consistent

Process

How product and experience design engagements run.

  1. Stage 1

    Discover and Diagnose

    Business, workforce and compliance analysis.

    Tech deliverablesProcess map, data-flow map, risk register
  2. Stage 2

    Design and Align

    Solution architecture, operating models, integration planning.

    Tech deliverablesArchitecture, prototype, test plan
  3. Stage 3

    Implement and Enable

    Deployment, onboarding, system validation, change management.

    Tech deliverablesBuild, integrate, test, train
  4. Stage 4

    Govern and Optimize

    Continuous compliance monitoring, reporting, automation and enhancement.

    Tech deliverablesMonitor, support, improve

Technologies

Tools we would use.

[Confirm the real stack]
  • Design

    • Figma
    • Design tokens
    • Prototyping
  • Research

    • Interviews
    • Usability tests
    • Analytics
  • Build handover

    • React components
    • Accessibility specs
    • Storybook

Industries

Where this matters most.

  • Oil and gas

    Tools designed for supervisors working on site, in gloves and daylight.

  • Pharmaceuticals

    Interfaces that make the compliant action the easy one.

  • Chemicals and fertilizers

    Clear shift and handover screens for plant teams.

FAQ

Questions we hear.

Answers are drafted for review. Anything that needs a fact from Stellar is marked.

Yes. Design work can stand alone and be built by us or by your own team.

Have a business challenge worth solving?

Tell us what you're trying to fix. An engineer will reply, not a form robot.

Let's Build ItContact us on WhatsApp